Group – Economics[LINK]
EnergyPlus contains a number of objects to model construction cost and utility bill calculations.
The objects used by EnergyPlus for construction cost calculations are as follows:
The objects used by EnergyPlus for utility bill calculations are as follows:
The objects used for performing a life-cycle cost analysis are:
The object used for specifying the currency symbol of the monetary unit used is:
Group – Economics[LINK]
EnergyPlus contains a number of objects to model construction cost and utility bill calculations.
The objects used by EnergyPlus for construction cost calculations are as follows:
ComponentCost:Adjustments
ComponentCost:Reference
ComponentCost:LineItem
The objects used by EnergyPlus for utility bill calculations are as follows:
UtilityCost:Tariff
UtilityCost:Qualify
UtilityCost:Charge:Simple
UtilityCost:Charge:Block
UtilityCost:Ratchet
UtilityCost:Variable
UtilityCost:Computation
The objects used for performing a life-cycle cost analysis are:
LifeCycleCost:Parameters
LifeCycleCost:RecurringCosts
LifeCycleCost:NonrecurringCost
LifeCycleCost:UsePriceEscalation
LifeCycleCost:UseAdjustment
The object used for specifying the currency symbol of the monetary unit used is:
Documentation content copyright © 1996-2015 The Board of Trustees of the University of Illinois and the Regents of the University of California through the Ernest Orlando Lawrence Berkeley National Laboratory. All rights reserved. EnergyPlus is a trademark of the US Department of Energy.
This documentation is made available under the EnergyPlus Open Source License v1.0.